top of page

Mission-Critical Facility Site Suitability Criteria

ARS can specify those factors that should be considered in determining where to locate a mission-critical facility. They incorporate many of the same risk factors as all-hazard risk assessments but also specify local supporting infrastructure requirements to speed the site selection process and to save money, both up front as well as over the life-span of the asset.

bottom of page